Location
Energy type
Natural Gas, Coal, Nuclear
Natural Gas, Coal, Nuclear
Power plant could generate power more efficiently by utilizing bitcoin mining farm as a battery to balance load.
Multiple tech jobs were opened, which diversified local labor market.
The goal of the project was to establish a good working relationship with a miner manufacturer and work with wasted wind energy to transform it into a new revenue stream in cryptocurrency.
The area had a lot of dust because of the windy conditions and the lack of water supply, made keeping air filters clean.
EZ Blockchain’s redesigned the mobile data center with a unique shelving system and airflow system to bring its capacity up to 2.5 MWs, installing 720 x Bitmain S19 type miners. Our engineering team had to design a separate electrical room built from scratch to make the work of the electrical operations team simpler and safer. The design of the mobile data center was divided in 6 separate sections, each had its own autonomous electrical surge protection infrastructure to operate each section independently.
The location and remoteness of the site provided us with a few unique challenges, such as but not limited to excavation of the site, getting a proper fiber connection and the effects of extreme temperature.
This location has us working closely with our customers and the local community, as we are always trying to resolve issues that make each site unique.